Learning Objectives

Upon completion of this course, the design professional will be able to:

  1. Discuss owner’s design intent and how it drives project requirements, thereby directly impacting specification language.

  2. Review specific industry documents and reference standards that drives the requirement to moisture test all concrete slabs.

  3. Investigate the genesis of current 09 flooring specification language.

  4. Specify sustainable design processes that eliminate: (1) project delivery delays due to concrete slab moisture, (2) subsequent bond or moisture failures, and (3) design team liability for each.

Comments

None

Jessica Boone

No comment

Ricardo Brito

very informative

James Matichuk

Good concrete info -

Chris White

great presentation

ROBERT HAM

Very Informative

Jonathan Berkman

Yaay

Dan Grudek

good course

kevin conley

Great concrete spec info, thank you!

Kipp Edick

Thank you

Alexandra Tailer

Great!

Mark Jensen

Interesting technical nuance on specs

Alex Gil

More good concrete slab information

John D Skodi

Great information

Ryan Schaaf

Joan Baydoun

Good course

Shawn Xiaotu Xu

Specifications Strategies to Eliminate Concrete Moisture

FREE

In the macro critical path of project delivery, installation of final floor finishes is one of the last items to occur prior to substantial completion. However, due to changes in adhesive formulations driven by concerns over indoor environmental quality, most project 09 flooring specifications require moisture testing before flooring can be installed on concrete slabs. Should/when those moisture tests fail, the project faces burdensome time delays, unexpected costs, or both. During this presentation, we will: (1) give significant discussion to the importance of “design intent” and how losing focus on what the owner expects can lead to potentially catastrophic, consequences (2) examine in depth several misconceptions embedded within the AEC associated with field moisture testing and project owner and design team liability associated with concrete moisture induced flooring failure; and (3) we will give clear recommendations as to how the specifying professional can eliminate concrete moisture as a project delivery issue while simultaneously protecting the project owner and design team from project delivery delays/cost overruns and future failed flooring.

Credits: 1 AIA HSW + 1 AIBC Core LU + 1 IDCEC + 1 AAA Structured LU + 1 AANB, NSAA, ALBNL (EPP)

Length: 1h


You must be logged in to take a course. Please login or create an account here

Sponsored by



Download our App!



Categories

ADA
OX

Upcoming Events

Newsletter history